Projects

Bank of Provinces Sewage Treatment Plant Sea Discharge-Rize Çayeli
Can realised this construction under the rough conditions of the Black Sea, making all the calculations and projects; this project has been among the first in Turkey in the use of GRP pipes for the discharge of waste water, in which the flanged pipe, of 1.700 mtul. and a diameter of 600 cm., was laid on the sea floor, diffusors were built, 600 mtul. long steel pipes, with the same diameter, were laid and the biological treatment plant, pump building, administrative and control building were constructed in the outlet of the city sewage system.
The project, completed in 18 months, despite the extremely rough conditions of the Black Sea region, involved 4 engineers, 1 technician, 4 administrative staff members and 85 workers during the peak period.

.................................................................................

Istanbul Aid Group Infrastructural Works of 132 Houses and Social Facilities in Yalova
This project, covering the site with 192 prefabricated houses built to aid earthquake victims after the Marmara earthquake in 1999, involved the construction of the foundations of the buildings, establishment of the sewage and clean water lines and house connections, the electrical system outside the buildings, the illumination of the fields and roads, the environmental design, construction of the roads, the formation of the open fields, the contruction of the outdoor football pitch and cultural facilities. Under the consultancy of Talu Architects Ltd., the project was completed in 2 months and handed over to the victims of the earthquake, with the contribution of 2 engineers, 1 technician, 3 administrative personel members and 60 workers during the peak period.

..................................................................................

Offices and Business Centers
Turgutreis Municipality Building

This was a turn-key construction job involving the installation of the electrical, waste water and clean water system in reinforced concrete skeleton in the 3-storey Municipality Service Building at the entrance of Turgutreis, with a construction area of approximately 4.500 m2, carrying the architectural characteristics of the region. The employer was the Municipality of Turgutreis and the job was procured by The Bank of Provinces. This has been the first turn-key project of Can Construction.
The calculations and the projects of this job were realized by the employer. The turn-key completion of the construction took 8 months.

................................................................................

Corus Adapazarı Headquarters
This has been the turn-key construction work involving the adaptation of the 4-storey Headquarter offices with 1.150 m2 use area in Adapazarı, into the new earthquake legislation, the construction of additional buildings, the realization of all detailed workmanhip, electrical, mechanic works, basic design and projects.
The project involved 2 engineers, 1 architect, 1 technician, 1 administrative staff member and 70 workers and has been completed in 5 months.

.................................................................................

Borşen Headquarters
This building, reflecting a different architectural design, was constructed in Dudullu, Istanbul. The panels used in the façades and on the roof covering were been tailor-made and the project was completed in 2,5 months. The project involved 3 architects and engineers, 2 administrative staff members and approximately 50 workers.