Çayeli Waste Water Treatment Plant

Iinstallation of 1700 m long glass reinforced polyester flange pipe with 600 cm diameter on the bottom of the undersea ground, manufacturing the diffuser, installation of 600 mt long pipe with 600 cm diameter at shore exit and construction of the biologic treatment plant on the city sewage output, pump building and administration building. Biological treatment plant, pump building, administrative and control building were constructed in the outlet of the city sewage system works.

Completion Date : 1991

Project Details

Çayeli Waste Water Treatment Plant